Monday, December 14, 2009
Operating the Dixie Central
The layout is designed to be operated by a crew as large as five or as small as one. There are a variety of ways to operate a small layout. Now I'm starting to kick around the ideas.
I do like car cards and think they are very handy. Most likely we will use them.
If we run two locomotive crews (conductor and engineer) then we'll probably want to look at Time Table methods.
I'm open for ideas! So post a comment below!
Here is a great primer on TT/TO:
http://www.gatewaynmra.org/tto.htm
I do like car cards and think they are very handy. Most likely we will use them.
If we run two locomotive crews (conductor and engineer) then we'll probably want to look at Time Table methods.
I'm open for ideas! So post a comment below!
Here is a great primer on TT/TO:
http://www.gatewaynmra.org/tto.htm
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment